-
Supplier: Mile-X Equipment, Inc.
Description: Jet 5SS-1C-10, 5 Ton Chain Hoist This Jet hoist ships by truck. Please notify Mile-X Equipment if residential or liftgate is required. Please note that for residential deliveries someone must be there to accept delivery. 5SS-1C-10, 5 TON 1
-
Supplier: Mile-X Equipment, Inc.
Description: Jet 5SS-3C-20, 5 Ton Chain Hoist This Jet hoist ships by truck. Please notify Mile-X Equipment if residential or liftgate is required. Please note that for residential deliveries someone must be there to accept delivery. 5SS-3C-20, 5
-
Supplier: Mile-X Equipment, Inc.
Description: Jet 5SS-3C-10, 5 Ton Chain Hoist This Jet hoist ships by truck. Please notify Mile-X Equipment if residential or liftgate is required. Please note that for residential deliveries someone must be there to accept delivery. 5SS-3C-10, 5
-
-
Supplier: Mile-X Equipment, Inc.
Description: Jet 5SS-1C-15, 5 Ton Chain Hoist This Jet hoist ships by truck. Please notify Mile-X Equipment if residential or liftgate is required. Please note that for residential deliveries someone must be there to accept delivery. 5SS-1C-15, 5 TON 1PH
-
Supplier: Ace Crane
Description: Standard Features: Trolley Speed 36 FPM (1&2 Ton) Trolley Speed 33 FPM (3 & 5 Ton) Simple adjustment of the trolley flange width Universal trolley wheels for all common steel beams Upper and Lower Limit Switch Side Guide Rollers
- Hoist Mounting: Trolley Mount
- Lift: 20 ft
- Line Type: Chain
- Load Capacity: 2000 to 10000 lbs
Find Suppliers by Category Top
Featured Products Top
-
With a linear velocity of 20 mm/sec, rotary velocity of 28°/sec, fast acceleration, and a load capacity of 5.5lbs, the H-811.S2iHP is ideal for automating tasks such as alignment, testing, and assembly of miniature optics and photonics components. Despite its compact size, it offers linear travel (read more)
Browse Robots Datasheets for PI (Physik Instrumente) L.P.
More Information Top
-
Real-time visualization in the offshore industry
The 5 ton electromagnet had a 1.5 m diameter and could be either on or off.
-
http://dspace.mit.edu/bitstream/handle/1721.1/93060/899994806-MIT.pdf?sequence=2
The homogeneity constraint results in magnets that are very heavy ( 5 -10 tons ) due to the numerous windings in the electro- magnet case or iron yokes and shim plates in the permanent magnet case.
-
Adjusting and modernization of the system converting units to synchronous capacitor operation at the Sayano-Shushenskoe hydroelectric station
… runner pit when converting the unit to SC operation (design): I) level sensor; 2) SC unit; 3) re- mote-control assembly; 4) control unit; 5 )valve; 6) dehumidifier; 7 … … opening, closing, and intensifier electromagnets ; OB, CB) hut- tons ; CI) output relay contact …
-
Alternating-current machines. A review of progress
… flywheels and two 60 MW salient-pole alternators on a common shaft having a total moment of inertia of 1040 tons -ft.2 The alternators feed the large electromagnet via phase-multi- plying … … 10-525kA at 15- 5 kV d.c, the …
-
Steel Castings Handbook
Fig. 2-104 5 - ton capacity crane hook steel casting quenched and tempered to 120 to 150 ksi (827 to 1034 MPa) tensile strength Fig. 2-106 Housing for an electromagnet made of steel castings in sizes up to 77 in …
-
RADIOACTIVE WASTE DISPOSAL PRACTICES IN THE ATOMIC ENERGY INDUSTRY. A Survey of the Costs
… 2 helpers - 12 m hrs/day at $2/hr on routine collection of contaminated materials; 5 m hrs/wk at … 2) 2|- Ton stake truck - U hrs/day at $2.36/hr* routine pickups Time of electromagnet stacking metal pile and bulldozer for shoving filter cake not known.
-
Control and speed‐characteristics of magnetically levitated vehicles of attracting‐magnet type
The design procedure proposed is ap- plicable to electromagnets of any dimensions. We have also confirmed by numerical calculation for the 5 - ton model vehicle that the model car is able to run at 100 to 200 km/h witnout using a second- ary suspension device and three times as fast if a secondary suspension …
-
Standard Handbook of Environmental Engineering, Second Edition > RECOVERY AND REUSE
The belt carried 1 to 3 tons /h (0.9 to 2.7 Mg/h) of waste at … Conductive nonferrous metals concentrated in the feedstock to about a 5 % level are ejected laterally off both sides of the belt by the electromagnets .
-
Journal of Aircraft > Progress toward magnetic suspension and balance systems for large wind tunnels
Fig. 5 Axisymmetric model at 0-60 deg angles of attack (Southamp- ton , view through MSBS, test section removed). Electromagnet (10) Controller (10 .
-
From history of Electrical Engineering III: Electromagnetism discovery and its fundamental laws in the first half of 19-th century
Ampere’s follower W. Sturgen created in 1825 the first electromagnet and J. Henry built the very power- ful electromagnet lifting 2 tons . 5 .
Indicates content that may require registration and/or purchase.