An OEM manufacturer of pasta making equipment had production process issues. Faulty pumps in the cooling system obstructed the flow of fresh water during pasta production. The customer needed a...
(Heating and Cooling Equipment)
From this Article:
They needed a climate testing chamber to pre-test their system for conformity with the necessary design criteria. In particular, checking the IP protection system (IP 54) is crucial to ensure that it...
(Heating and Cooling Equipment)
From this Article:
German manufacturer setting up a industrial laundry system for an airport in the Middle East needed to cool the electronic components that controlled the laundry system. When the washing machine drums...
(Heating and Cooling Equipment)
From this Article:
We had a specific request from an OEM Machine Builder. They were looking for a new enclosure heater to protect the electronics in their outdoor wind turbine systems. The product needed to be durable...
(Heating and Cooling Equipment)
From this Article:
An automotive OEM machine builder required a specific cooling solution that integrates into the electrical cabinets that house the controls for the their milling and turning equipment....
(Heating and Cooling Equipment)
From this Article:
We were approached by one of our customers to engineer an economical, integrated thermal management solution for their machines that use laser technology. The customer needed a solution that could...
(Heating and Cooling Equipment)
From this Article:
An automotive OEM manufacturer needed a chiller to integrate with their OEM machines. The main requirement from the OEM was to cool two separate circuits of oil, each of which must be controlled...
(Heating and Cooling Equipment)
From this Article:
An OEM machine builder turned to Pfannenberg for assistance with a project that required a chiller to fit in a smaller scale Ferrator water treatment system. Initially, a CC 6301 packaged chiller was...
(Heating and Cooling Equipment)
From this Article:
To provide a thermal management solution for railway tunnel enclosures in the Gotthard Tunnel, the world's longest tunnel. One of the greatest technical challenges on this project was to develop a...
(Heating and Cooling Equipment)
From this Article:
It's not uncommon for remote telecom enclosures to be located outdoors and need to withstand harsh environments. A telecom OEM approached Pfannenberg for an enclosure cooling solution for a project...
(Heating and Cooling Equipment)
From this Article:
A rail component manufacturer needed a solution to eliminate downtime caused from the overheating of their track drilling unit. The current system used 2 undersized chillers, unable to keep up with...
(Heating and Cooling Equipment)
From this Article:
A world leading manufacturer of hydraulic components and systems needed a smart and cost-effective solution to expand the cooling of lubricating oil used for machining metal parts. Their current...
(Heating and Cooling Equipment)
From this Article:
An end user turned to Pfannenberg for assistance with managing their enclosure temperatures in a particularly harsh environment. The company produce high-quality construction and insulation materials...
(Heating and Cooling Equipment)
From this Article:
An OEM manufacturer and fitter of multi-function housings in the telecommunications industry was lacking the resources to provide its customer with an electrical enclosure prototype with active...
(Heating and Cooling Equipment)
From this Article:
Most of the OEM equipment installed in the bakery called for air conditioners to cool the drives, PLCs and additional electronics. Most times ACs can be a convenient and effective method for cooling...
(Heating and Cooling Equipment)
From this Article:
An OEM machine builder in the marine industry needed a thermal management solution that was NEMA Type 4/4X rated, but also resistant to highly corrosive salt spray (fog). In an industry that...
(Heating and Cooling Equipment)
From this Article:
An OEM milling component manufacturer which develops processing centers for the precision boring and milling of high-precision components needed critical thermal management for their machine's control...
(Heating and Cooling Equipment)
From this Article:
The challenge was that this system would be located in a Class I, Div II environment, meaning the enclosure and components had to be explosion proof. To remain competitive in price, the system...
(Fans and Electronic Cooling)
From this Article:
Maintaining the proper climate inside industrial electrical enclosures is the key to trouble-free operation of the housed electrical components and, more importantly, the often delicate production...
(Alarms)
From this Article:
Accidents. Process upsets. Production downtime. Fire or gas leaks. These and other unexpected scenarios could hamper manufacturing, endanger workers, and threaten facilities and equipment. To help...
(Heating and Cooling Equipment)
From this Article:
A rail component manufacturer needed a solution to eliminate downtime caused from the overheating of their track drilling unit....