Accelerated Quality and Reliability Solutions

The following Glossary and Terms relates to all chapters of the book. In ECSS "Glossary of Terms", the International Electrotechnical Dictionary, and the Oxford English Dictionary as well as ISO/IEC Standard for Software Life Cycle Processes-Risk Management, and other [26] , [27] , [28] , [30] , [31] these terms are defined as follows:
| Acceptance: | The act of an authorized representative of the customer by which the customer for itself, or as an agent of another party, accepts ownership of existing and specified products tendered, or confirms satisfactory performance of specific services, as partial or complete performance of the contract on the part of the supplier. |
| Accident: | An undesired event arising from operation of any project-specific items which result in:
|
| Acceptance of risk: | Decision to cope with consequences, should a risk scenario materialize. |
| Alert: | The formal notification to users, informing them of failures or nonconformance's of items, already released for use or not, which could also be present on other items already delivered (e.g. items with identical design concept, materials, components or processes). |
| Availability: | The ability of an item to be in a state to perform a required function under given conditions at a given instant of time or over... |