Implementing a Mixed Model Kanban System: The Lean Replenishment Technique for Pull Production

WHAT IS A REQUIREMENTS STUDY

Once Emca Golf's kanban kaizen team understands the basic principles of kanban and has completed all the necessary kanban pull systems preparation work we discussed in the previous sections, they can begin the process of determining the number of kanban needed to effectively link head machining and assembly.

To start out, the team must identify all of the golf club heads that are produced in head machining. The kaizen team identified the following part numbers:

HEAD PART NUMBER ANALYSIS

Club Type:

Putter

Pitching Wedge

Irons

Drivers

Head Part Number:

PL10

PWL10

IR10

DR10

PR20

PWR20

IR20

DR20

IR30

DR30

IL10

DL10

IL20

DL20

IL30

DL30

We can see from the above table that head machining is a shared resource that produces a variety of 16 different heads for club assembly.

Note

Kanban is very appropriate in controlling shared supplying resources.

Having identified the 16 part numbers that will be placed under kanban control, the kaizen team will need to quantify the amount of daily demand each head model places on head machining in order to satisfy the needs of its internal customer assembly. This is called performing a requirements study and the tool we use is called the Requirements Study Worksheet.

REQUIREMENTS STUDY WORKSHEET

COMPONENT: HEADS

Component Part Number

Average Daily Demand

A-B-C-D Designation

Machine Center 1 Cycle Time

Machine Center 2 Cycle Time

Selected Machine Center

Machine Center 1 Loading

UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Category: Machining Heads and Multiple Spindle Heads
Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.