Implementing a Mixed Model Kanban System: The Lean Replenishment Technique for Pull Production

RESOURCE ALLOCATION

We established previously that the head machining resource consists of two similar, but not identical, machine centers. During the resource allocation process, the team will determine which heads will be produced on which machine. The Emca team will be guided by their A-B-C-D analysis findings.

The machine cycle times for each golf club head were determined and are shown below.

MACHINE CYCLE TIME ANALYSIS

Head Part Number

Machine Center 1
Cycle Time (sec.)

Machine Center 2
Cycle Time (sec.)

PL10

45

36

PR20

45

36

PWL10

50

40

PWR20

50

40

IR10

65

30

IR20

65

30

IR30

65

30

IL10

65

30

IL20

65

30

IL30

65

30

DR10

120

85

DR20

120

85

DR30

120

85

DL10

120

85

DL20

120

85

DL30

120

85

A quick analysis indicates that regardless of which product is being produced, Machine Center 2 has a faster cycle time than Machine Center 1. As such, Machine Center 2 is the machine that Emca will want to run most, if not all, of their "A" and "B" items. These higher volume items are typically the leverage points in being able to maximize product velocity. In doing so, Emca will maximize inventory turnover performance and minimize manufacturing lead time for these items. Accordingly, Machine Center 1 has a slower cycle time, but also provides for a shorter set-up time. The team rightly determined Machine Center 1 should be used for the "C" items. The Machine Allocation Table, shown below, summarizes their initial...

UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Category: O-rings
Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.