Power Plant Construction Management: A Survival Guide

Managing the jobsite finances, the subject of the previous chapter, does not, by itself, guarantee a successful outcome. It 1 provides early warnings of problems, which can be used to make changes to alter the future. But what changes should be made, what can be changed? There are a host of items as follows:
Manpower
Schedule
Tools and equipment
Consumables
Materials
Site services
Making changes to the way any of these items are managed will impact the job. As described in the previous chapter, changing the manpower can dramatically alter both the schedule and the cost of the project. A change in the schedule, either compressing or extending it, will affect the final costs. Making a change in the way the tools and equipment are being used or managed can influence the end result. The same is true for the other items. Since all of the items listed here are integrated to form the total project, making changes in one will cause an effect in the others.
The purpose of this chapter is to delve into these items and explore how they should be cost-effectively managed and how to make changes, if necessary, to realize a net change to the bottom line, in other words, making cost-effective changes. Tools such as productivity management will be discussed. Business controls will be reviewed. The pros and cons of onsite vs. off-site work will be discussed. E-commerce and the Internet will be addressed. Outsourcing will be reviewed and so will bar coding.