Wet-Steam Turbines for Nuclear Power Plants

Schwieger, B., M. Leonard, S. Taylor, et al. 2002. First annual top plants survey. Power 46 (4): 27 70.
2002. Operating results with nuclear power plants in 2001 (in German). VGB PowerTech 82 (5): 27 67.
2003. "Operating results with nuclear power plants in 2002" (in German). VGB PowerTech 83 (5): 37 73.
Schwieger, First annual top plants survey. 27 70.
2000. Operating results with nuclear power plants in 1999. VGB PowerTech 80 (5): 17 53.
2001. Operating results with nuclear power plants in 2000 (in German). VGB PowerTech 81 (5): 29 66.
Sekine, Y. 1993. Nuclear power generation in Japan Present status and future prospects. Proceedings of the Institute of Mechanical Engineers 207 (A4): 233 246.
Proselkov, V. N., and V. D. Simonov. 1989. Technical problems associated with participation of nuclear power plants in governing load of power systems (in Russian). Energokhozyajstvo za Rubezhom 3: 11 15.
Kirillov, V. B., and A. S. Leyzerovich. 1985. Flexibility characteristics of wet-steam turbines of nuclear power stations. Thermal Engineering 32 (7): 366 370.
Mizuki, F., Y. Miyamoto, and T. Seiji. 1998. Control and instrumentation for ABWR plant. Hitachi Review 47 (5): 164 167.
Ibid.
Arkad'ev, B. A. 1986. Operating Conditions of Steam Turbosets for Nuclear Power Plants (in Russian). Moscow: Energoatomizdat, 1986.
Ibid.
Ibid.
Ibid.
Akerman, V. S., N. S. Gabrijchuk, V. B. Kirillov, A. S. Leyzerovich, et al. 1984. Results of field start-up tests for K-500-60/1500 turbine (in Russian) Elektricheskie Stantsii 2: 5 10.
Ibid.
Leyzerovich, A. S., and V. B.