Formulas and Calculations for Drilling, Production and Workover: All the Formulas You Need to Solve Drilling and Production Problems, Second Edition

Normal kill sheet
Prerecorded data
Original mud weight (OMW) ______________________________ ppg
Measured depth (MD) ___________________________________ ft
Kill rate pressure (KRP) _____________ psi @ ______________ spm
Kill rate pressure (KRP) _____________ psi @ ______________ spm
Drill string volume
Drill pipe capacity ____________ bbl/ft ____________ length, ft = ____________ bbl
Drill pipe capacity ____________ bbl/ft ____________ length, ft = ____________ bbl
Drill collar capacity ____________ bbl/ft ____________ length, ft = ____________ bbl
Total drill string volume _______________________________ bbl
Annular volume
Drill collar/open hole Capacity _________ bbl/ft __________ length, ft = __________ bbl
Drill pipe/open hole Capacity _________ bbl/ft __________ length, ft = __________ bbl
Drill pipe/casing Capacity _________ bbl/ft __________ length, ft = __________ bbl
Total barrels in open hole ______________________________ bbl
Total annular volume __________________________________ bbl
Pump data
Pump output ______________ bbl/stk @ ____________ % efficiency
Surface to bit strokes:
Drill string volume ____________ bbl pump output, bbl/stk = ____________ stk
Bit to casing shoe strokes:
Open hole volume ____________ bbl pump output, bbl/stk = ____________ stk
Bit to surface strokes:
Annulus volume ____________ bbl pump output, bbl/stk = ____________ st
Maximum allowable shut-in casing pressure:
Leak-off test ____________ psi, using ____________ ppg mud weight
@ casing setting depth of __________________________________ TVD
Kick data
SIDPP ________________________________________________ psi
SICP__________________________________________________ psi
Pit gain ________________________________________________ bbl
True vertical depth ________________________________________ ft
Calculations
Kill weight mud (KWM)
= SIDPP ________ psi 0.052 TVD ________ ft + OMW...