Wind Power Integration: Connection and System Operational Aspects

| AC | alternating current |
| AWPT | Advanced Wind Prediction Tool |
| BETTA | British Electricity Trading and Transmission Arrangements |
| CCGT | combined cycle gas turbine |
| DC | direct current |
| DFIG | doubly-fed induction generator |
| DSO | Distribution System Operator |
| DTI | Department of Trade and Industry (UK) |
| EMS | energy management system |
| FACTS | flexible alternating current transmission system |
| GTS | Global Telecommunication System |
| HIRLAM | High Resolution Limited Area Model |
| HV | high voltage |
| IGBT | insulated-gate bipolar transistor |
| ISO | Independent System Operator |
| LDC | line drop compensation |
| MAE | mean absolute error |
| MOS | model output statistics |
| NETA | New Electricity Trading Arrangements (BETTA s predecessor) |
| NFFO | Non-Fossil Fuel Obligation |
| NWP | numerical weather prediction |
| OCGT | open cycle gas turbine |
| OFGEM | Office of Gas and Electricity Markets (UK) |
| PFCC | power factor correction capacitance |
| PI | proportional + integral |
| PWM | pulse width modulation |
| RAS | remedial action scheme |
| RMSE | root mean square error |
| ROC | Renewable Obligation Certificate |
| ROCOA | rate of change of angle |
| ROCOF | rate of change of frequency |
| SCADA | supervisory, control and data acquisition (system) |
| SDE | standard deviation of errors |
| SEM | Single Electricity Market (Ireland) |
| STATCOM | static compensator |
| SVC | static VAr compensator |
| TSO | Transmission System Operator |