Progressive Manufacturing: Managing Uncertainty While Blazing a Trail to Success

Do not squander time for that is the stuff that life is made of.
Ben Franklin
The lead time for any activity is the time it takes to perform that activity. In production and inventory management jargon, lead time is typically the time it takes to purchase or manufacture a part. If a part is manufactured in-house, the lead time is referred to as the manufacturing lead time, and if it is purchased, it is called the purchasing lead time. Typically, these times reflect the number of days from when an order is placed to when the part is received. While it utilizes a definite start and finish date, this approach sometimes understates the amount of time that it takes to build or buy a part. Lead time should include the time interval between the time it is determined that a part needs to be ordered and the time the part is expected to be available for use. This includes certain administrative activities, which are performed before the order is placed. I will refer to the time taken to perform these activities as administrative lead time.
In fact, the definition [1] provided by APICS says just that:
A span of time required to perform a process (or series of operations).
In a logistics context, the time between recognition of the need for an order and the receipt of goods. Individual components of lead time can include order preparation time, queue time, processing time, move or transportation...