Products/Services for Subsea Cable Pulling Winches

Product News

More Information

Lock Indicates content that may require registration and/or purchase. Powered by IHS Goldfire

  • Installation of STP Mooring System And FPSO Hookup In South China Sea
    … blocks with sufficient wire length and load carrying capacity for handling and deployment of mooring lines. y 72Te connection frame with 2×10Te electrical-driven pull -in winch for subsea connection of the sockets … … wires, riser and power cable systems. y Chain handling …
  • PIOVRA
    … umbilical and winch and can be reconfigured, in a modular fashion, on the deck of a vessel, to carry out cable and pipeline burial, de … … portable source of energy subsea ; and craneage, lifting and manipulative tasks; winch pulling to support tie-ins …
  • PG&E WaveConnect Program Final Report
    Submarine transmission cable should be buried using an industry standard subsea cable plow selected based on the seafloor conditions. The cable will be pulled ashore using specialized winches , standard construction equipment, a cable rigged through a swivel pulling head, and cable stopper.
  • Dynamic simulation and tension compensation research on subsea umbilical cable laying system
    A fluctuation simulation cylinder is placed on the base of the winch, which can both push and pull the winch to simulate a tightening and slacking cable under heave disturbance. Fig. 11 Prototype of the subsea umbilical cable laying system .
  • A Successful Effort to Dramatically Reduce Completion Costs
    Since Shell’s accepted flowline pull -in operation requires a rig-mounted winch of considerable tension capacity and a wire length long enough to reach the seafloor, the idea of using this winch to lower subsea equipment was investigated. … subsea tree to the suspended marine riser, 3) the proximity of the winch cable to the ROV …
  • Liuhua 11-1 Development-FPS Flexible Risers
    The cable was payed out from the riser deployment winch over the turndown sheave and down through the riser moonpool. The subsea end of the riser was lowered to approximately 20 ft above the waterline, where it was pulled .
  • Deployment Effects of Marin Renewable Energy Technologies
    The subsea cable is pulled back through the directionally drilled hole. … the seabed between multiple units are recovered by a barge equipped with a winch on the surface.
  • Anadarko Independence Project Completion Campaign: Executing the Plan
    The Deepwater Millennium became the first dynamically positioned rig to be outfitted with a LARS to provide the ability to operate the BOP running and pulling separate from the running and pulling of the IWOCS cable (s). The LARS/IWOCS designed for use on the Deepwater Millennium is basically comprised of seven components: A winch (with level wind and power unit), an underwater termination assembly … … by Remotely Operated Vehicle, or ROV, between the UTA and subsea tree), and an A …