Practical Batch Process Management

Exercise 2

Identify and Define Physical Models

1.

The physical model described in the ISA S88 Part 1 standard has the following elements:

  • Area, Control module, Enterprise, Equipment module, Process cell, Site, Unit.

    1. List elements of the physical model covered by scope of the ISA S88 Part 1 standards.

    2. Which element of physical model is a domain for a batch control system?

    3. Which physical model elements may contain element(s) of same levels?

    4. Physical model element for carrying out major processing activity:

    5. Physical model element that performs basic control:

    6. Physical model element for carrying out minor processing activity:

2.

Tick those you will identify as a unit, from the following:

1.

Reactor

[

]

2.

Pump

[

]

3.

Mixing tank

[

]

4.

Ingredient storage tank

[

]

5.

A refrigerator

[

]

6.

A washing machine

[

]

7.

A kitchen blender

[

]

3.

State the following statements as either TRUE or FALSE:

1.

Physical model is collapsible.

[

]

2.

Batching can occur without units.

[

]

3.

Control modules are defined in the batch management system.

[

]

4.

A process cell is usually independent of product.

[

]

5.

A process cell must contain at least one unit.

[

]

6.

A control module does not have to be part of an equipment module to be a part of unit.

[

]

7.

Unit can contain more than one batch at a time.

[

]

8.

Equipment modules execute portions of a recipe, but control modules do...

UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Category: Backplanes
Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.