Business Process Management Applied: Creating the Value Managed Enterprise

Design and production engineering go hand in hand with supply chain improvements efforts. Ineffective product design or design for manufacture and supply inhibit profitability just as much as poor supply chain design and execution. In fact, the two sets of processes are complementary, and we see the same five levels of maturity firms at level 1 in their supply chain thinking tend to be level 1 in their design and production engineering thinking.
The maturity matrices for the design and production engineering processes are shown in Tables 1.3 and 1.4. The matching technology maturity matrix is provided in Table 1.5.
| Maturity Level 1 | Maturity Level 2 | Maturity Level 3 | Maturity Level 4 | Maturity Level 5 | |
|---|---|---|---|---|---|
| Manage Product Portfolio |
|
|
|
|
|