Essentials of Lean Six Sigma

| AI. | Highlights of Symbols and Abbreviations |
| AII. | Chapter 10 Case Study Extended Equations |
| AIII. | Values of y = exp( ??) |
| AIV. | DPMO to Sigma to Yield % Conversion Table |
| AV. | Standard Normal Distribution |
| AVI. | Critical Values of t-Distribution |
| AVII. | Critical Values of Chi-Square Distribution with Degrees of Freedom |
| AVIII. | Upper Critical Values of the F-Distribution for df 1 Numerator Degrees of Freedom and df 2 Denominator Degrees of Freedom |
| AIX. | Deming's Condensation of the 14 Points for Management |
| AX. | Scorecard for Performance Reporting |
| AXI. | Scorecard for Performance Reporting (Partly Completed Example) |
| ANOVA | Analysis of Variance | |
| b 0 | y-intercept in the prediction equation | |
| b 1 | The coefficient of linear effect of variable in a regression model | |
| b 11 | The coefficient of quadratic term for the first variable in a regression model | |
| C p | Process capability (assumes process centered on the target) | |
| C pk | Process capability index (does not assume process is centered on the target) | |
| DOE | Design of experiment | |
| df | Degrees of freedom | |
| f | Function (used to describe a function) | |
| f(x) | Function of x | |
| P p | Process performance | |
| P pk | Process performance index | |
| s | Sample standard deviation | |
| USL | Upper specification limit | |
| LSL | Lower specification limit | |
| z | A standardized value | |
| ? | Mean | |
| ? | Standard deviation of population | |
| ? | Integral of | |
| ? b a | Integral between the limits a and |