-
Description: •User-centred Evaluation of Information Retrieval Systems •Multimedia Resource Discovery •Image Users’ Needs and Searching Behaviour •Web Information Retrieval •Mobile Search •Context and Information Retrieval •Text Categorisation and Genre in Information
-
Supplier: Modula
Description: The Modula™ Vertical Carousel is our leading edge vertical carousel storage and retrieval system that maximizes space utilization, efficiency and productivity in all types of applications. Engineered for safe and reliable operation, the innovative features of the Modula®
-
Supplier: FLSmidth
Description: , causing yet more issues – and all the product you can’t reclaim is money and time wasted on retrieval operations that can be risky to personnel and silo structures. We use advanced fluidization technology to move material out of storage smoothly and effortlessly. Our Ful-Floor™
-
-
Supplier: RS Components, Ltd.
Description: Fall arrest block with integral winch for the emergency recovery, and safe retrieval of injuried personnel. Aluminium housing with powdered finish. Twistlock fall indicating, swivel eye karabiner. 15m (50ft) cable. 136kg maximum load Equipment Type = Arrest Block
- Type: Other
-
Supplier: Roth & Rau - Ortner USA, Inc.
Description: Our Service Center Solution (SCS) can provide a customized solution that exactly gets your needs. SCS will provide reduced maintenance cost while improving efficiency and increasing profitability. We provide a domestic, shared team of highly skilled and experienced maintenance personnel
- Additional Capabilities: Cleanroom Application, Custom Equipment Design
- Capabilities: Automatic Guided Vehicles (AGV), Automated Storage and Retrieval (ASRS), Conveyors, Lifts, Robotics
- Industries Served: Computer, Food / Beverage, Microelectronics / Semiconductor, Telecommunications
- Location: North America, United States Only, Northeast US Only, Southwest US Only, Europe Only, South Asia Only, East Asia / Pacific Only, Other
-
Description: Retrieval 25 5.3 Incident Termination 27 6. First Aid and Emergency Medical Care 27 6.1 General Requirements 27 6.2 First-Aid Personnel 27 6.3 First-Aid Kits 27 6.4 First-Aid Stations and Infirmaries 28 7. Appendices
-
Supplier: CSA Group
Description: Standard is not applicable to a) permanently installed personnel-lifting appliances serving defined levels b) fire-fighting and fire rescue appliances c) unguided work cages suspended from lifting appliances d) elevating operator position on rail-dependent storage and retrieval
Find Suppliers by Category Top
Featured Products Top
-
megapixel imaging system that closely focuses in on the names, numbers, labels, color and other details of drugs and syringes is utilized. The integrated systems include image recognition and barcode scanning features as well as a storage and retrieval image system that allows for (read more)
Browse Clean Benches Datasheets for Baker -
engineering organization from using hardcopy workflow requiring manual searching through the thousands of hardcopy pages and countless binders of the current 2019 BPV Code or earlier revisions to a management system allowing rapid (read more)
Browse Standards and Technical Documents Datasheets for Accuris -
materials management Tracking technologies applied to raw material storage and retrieval ensure that production never stops, enabling: Automatic and reliable raw material location tracking Real-time accurate inventories and minimization of lot sizes Autonomous (read more)
Browse Network Cards and Network Controllers Datasheets for ifm electronic gmbh -
materials management Tracking technologies applied to raw material storage and retrieval ensure that production never stops, enabling: Automatic and reliable raw material location tracking Real-time accurate inventories and minimization of lot sizes Autonomous (read more)
Browse Data Acquisition Datasheets for ifm electronic gmbh
More Information Top
-
States > Texas > State > Register > 2015 > 05/29/2015
An approved personnel retrieval system should be provided for continued space en- try.
-
Decontamination and decommissioning of the JANUS reactor at the Argonne National Laboratory-East site
(The small working area above the vessel was a permit required confined space and required personnel retrieval system (s) for workers in this area).
-
Decontamination and decommissioning of the JANUS reactor at the Argonne National Laboratory-East site
(The small working area above the vessel was a permit required confined space and required personnel retrieval system (s) for workers in this area).
-
Integrated Worker Radiation Dose Assessment for the K Basins
K East Basin Fuel Retrieval System Personnel Doses.
-
Human factors analysis and design methods for nuclear waste retrieval systems. Human factors design methodology and integration plan
To evaluate operator training, the best approach may be to conduct extensive interviews with personnel after the retrieval system has been in operation for a number of months.
-
AX Tank Farm waste retrieval alternatives cost estimates
The rates are based on the assumptionthat an offsite retrieval vendor will design, fabricate, and operate the vehicle retrieval system similar to the C-106 Heel retrieval system (PHMC personnel will operate the sluicing system).