7.2: HLI-generation capacity

7.2 HLI-generation capacity

During the planning phase of global generation, it was necessary to determine both how much capacity needed to be installed and when, so as to satisfy the expected demand at some point of time in the future and to provide sufficient reserve to perform corrective and preventive maintenance. This forms the HLI assessment. At HLI, the ability to move the energy to bulk supply points (BSPs) or end customers was not considered. Historically, the reserve capacity was set equal to a percentage of the expected load, or equal to one or more largest units, or a combination of both. These deterministic criteria could be, and in many cases were, replaced by probabilistic methods that responded to the stochastic factors influencing the reliability of the system.

A number of probabilistic criteria and indices are available for HLI studies [12 15]. These include loss of load probability (LOLP), loss of load expectation (LOLE), loss of energy expectation (LOEE), expected energy not supplied (EENS), expected unserved energy (EUE), energy index of reliability (EIR), energy index of unreliability (EIU) and system minutes (SM). A brief description of each is given in Table 7.1. It is important to recognise that these indices are not measures actually seen by the end customers but are really relative measures by which alternative planning scenarios can be objectively compared.

Table 7.1: HLI probabilistic criteria and indices

Index

Definition

LOLP

the probability that the load will exceed the available generation; it defines the likelihood of encountering trouble but...

UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Category: Reserve Batteries
Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.