Planning & Scheduling Using Primavera Version 5.0 for Engineering & Construction: Planning and Progressing a Single Project Schedule With and Without Resources In An Established Project Environment

Copyright 2005 by Eastwood Harris Pty Ltd.
No part of this publication may be reproduced or used in any form or by any method without the written permission of the author.
Primavera, the Primavera sundial logo, P3, P3e, P3e/c, Primavera Enterprise, Primavera Expedition, Primavera Project Planner, Primavera TeamPlay, Primavision, PrimeContract, and SureTrak are either registered trademarks or trademarks of Primavera Systems, Inc. in the United States and/or other countries.
Windows, Microsoft Project Standard 2003, Microsoft Project Professional 2003, Microsoft Project Standard 2002, Microsoft Project Professional 2002, Microsoft Project 2000, Microsoft Project 98 and Excel are registered trademarks of Microsoft Corporation.
Adobe and Acrobat are registered trademarks of Adobe Systems Incorporated.
All other company or product names may be trademarks of their respective owners.
Screen captures were reprinted with authorization from Primavera Systems Inc.
This publication was created by Eastwood Harris Pty Ltd and is not a product of Primavera Systems Inc.
DISCLAIMER
The information contained in this book is to the best of the author's knowledge true and correct. The author has made every effort to ensure accuracy of this publication, but may not be held responsible for any loss or damage arising from any information in this book.
AUTHOR AND PUBLISHER
Paul E Harris
Eastwood Harris Pty Ltd
PO Box 4032
Doncaster Heights 3109
Victoria, Australia
| Email: | harrispe@eh.com.au |
| Web: | http://www.eh.com.au |
| Tel: | +61 (0)4 1118 7701 |
| Fax: | +61 (0)3 9846 7700 |
Please send any comments on this publication to the author.
ISBN 1-921059-09-5 A4 Paperback